top of page
curtis35188

Repairs on Condor Express are moving foreward !



The above photos show (1) the new wheelhouse aluminum shell and reinforcement beams, and (2) a crane removing the antenna mast from the flybridge en route to the sand and paint shop.

Repairs and modifications of the Condor Express are moving ahead under the supervision of Captain Mat Curto. The boat is now hauled out in the boat yard and things are being done on all fronts. The decks have been sand blasted, the wheelhouse structural damage is all fixed and new. The new teak panels are all cut and trimmed to size and ready for installation. New wiring to the wheelhouse has been run and the roof of the galley is ready for new teak. While I was there a huge crane was lifting off the antenna mast so it can be sent to the paint shop.

Things are on track and the Condor Express will be back and better than ever asap.

Stay tuned !

Bob Perry Condor Expres

Recent Posts

See All

An epic cetacean-filled day.

2018 12-07 SB Channel Clear, sunny skies and calm seas prevailed once again in the beautiful Santa Barbara Channel. A massive feeding...

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
bottom of page